10 Bank Street LONDON

10 BANK STREET | LONDON
Concrete Works

Canary Wharf Construction Ltd engaged the construction of concrete foundations for the install of a garden/park area adjacent to 10 Bank Street, Canary Wharf.  Over 250m3 of concrete was needed for the foundation works cast over various datum levels.  Our completed work was handed-over ahead of schedule which in return, allowed the construction of the park area by others.

CLIENT: Canary Wharf Construction Ltd

Measured Works 

250m3 of concrete was cast over a period of three  months via a tower crane.

  • Excavation works
  • Formwork/concrete layout
  • Footings for scaffold deck